# Plan: Kestrel Grounds and Landscaping, success-plan review meeting deck (2026-11-14)

## Playbook suggestion
The CSM asked for this meeting (/prep Kestrel meeting success-plan, purpose success_plan_review); no play fired for it. Nearest play read: feature-adoption (A-11, timesheets not in use after day 90, low; rank 31). The other open action is R-08 re-engage (NPS 6, low, internal only). Neither is the lead here; feature-adoption supplies one proposal (timesheets, one feature, F22, F29).

## My read of the account
1. Kestrel is a grounds-maintenance business, about 1900 staff, serving councils and estates (public profile). Tallyroot Dispatch (1650 seats) and Assure (1485 seats) are what they own (F7, F8). The plan ties Dispatch to crew scheduling, new-starter onboarding and route planning.
2. Signals together: activation 96.2% and flat over 84 days (F51, F39); active share steady at 62.0%, inside a seasonal range noted by the CSM-side record. Plan: crew scheduling complete (F46), onboarding on track (F43), route planning outcome carries a not-customer-safe status (F49) and is due 14 December 2026 (F48). Internal only: NPS 6 (F23), renewal 225 days out (F14). Most important: the third outcome is the one to discuss, and no outcome has a dated reading of its own measure.
3. Options: (a) full meeting deck (chosen); (b) internal note only, no contact: cheap but wastes a requested meeting; (c) do nothing yet: the 14 December due date is close. Cost to customer is one meeting; risk is reading as a verdict, so no status is shown for objective 3 and its tile reads "not available".
4. Chosen: a seven-slide Prepare deck that asks. Would change my mind: if the CSM learns the plan is superseded or the meeting is moved.
5. Recipient of the cover note: Daniel Sato, Service Manager (champion, F3); the deck is for the CSM to present. The AE (Dana Whitlock, F17) joins only if commercial topics arise.
6. Format: deck plus short held cover note; kind meeting, purpose success_plan_review. Intent: agree readings and decisions on keep, drop or add. Shape: Prepare. Left out: objective 3 status, owners, ticket counts, health/risk wording, renewal timing, any new product (growth CLOSED). Slides: seven exactly (title, plan table, status tiles, activation chart, question, proposals, next steps).
7. To confirm: meeting date and attendees; who holds each measure's figure; whether first-week activation is tracked; the 28 October note (mobile app sync issue with support) says there is an open item, while the sheet shows no open tickets: check before the call and avoid the topic unless raised. The saved history is off, so no year-on-year view.
8. Brand: default look. Canva avoided per the owner's instruction.

## Sources weighed
- Internal signals: A-11 timesheets, R-08 NPS 6 (internal), plan statuses, trend facts F38-F40, F51-F52.
- Weekly brief: 0 items on vendors Kestrel lists (Hopframe not in this week's brief); not used.
- Public profile: grounds maintenance, regulator audit and common toolset priorities; used only as prompts in notes, not stated on slides.
- History pack: steady, history off; note of 28 October 2026 (17 days old).

## Your next steps
- Confirm the meeting date and attendees; send the customer .pptx or the PDF yourself (never the .csm.pptx).
- Get the current figure for each measure before the call, especially visits completed on the planned day.
- Add the timeline entry after the meeting; tell the AE only if commercial topics come up.
- Review the notes in the CSM copy; the question slide is for listening.

Decision: adapted. No play fired for a meeting; I used the CSM's request and borrowed feature-adoption for one proposal, and kept R-08 and the objective 3 status internal.

Outcome: draft written (deck, held cover draft). Files: decks/2026-11-14/001TR00020000DUMMY-meeting-success-plan.deck.json (.pptx, .csm.pptx, .pdf), drafts/2026-11-14/001TR00020000DUMMY-meeting-success-plan.md, drafts/2026-11-14/001TR00020000DUMMY.plan.md
